Date Status Type Summary
Oct 16, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM. OBSERVED CRACKED STONE AT EXP 1 AND EXP 3. AT EXP 4 CRACK ON MASONRY OBSERVED. AT ROOF, VERTICAL CRACK ON MASONRY ON WATER TANK & CRACK/DAMAGED MORTAR JOINTS ON PARAPET OBSERVED ALSO. REMEDY: REPAIR AND/OR REPLACE
Jul 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EWO DUE TO STEP CRACKS IN BRICK MASONRY & MORTAR JOINTS WITH DETERIORA MORTAR JOINTS EXP1E ELE & EXP4 (N ELE). BLDG IS CURRENTLY UNSAFE REMEDY:OWNER TO IMMEDIATELY EXTEND SIDEWALK SHED ALONG ENTIRE EXP1 INCLUDING ENTRANCE & EXPOSURE 4 UNDER THE DIRECTION AND SUPERVISION OF A LICENSED PROFESSIONAL
Jul 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION, OBSERVED CRACK/LOOSE/MISSING MORTAR AND BRICK MASONRY AT EXPOSURE 1 AND EXPOSURE 4. SPALLING BRICK OBSERVED AT EXPOSURE 1 AND EXPOSURE 2. DAMAGED DOOR FRAME AT THE ENTRANCE. REMEDY: REPAIR AND/OR REPLACE
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT THE TIME OF INSPECTION,OBSERVED THAT A STONE RW IS LEANING INWARD A T EXP3 WITH STEEL C-CHANNEL BRACING INSTALLED TO SUPPORT THE WALL.THE BRACING APPEARS TO BE DETACHED FROM THE RW AND STEEL C-CHANNEL SHOW SI GNIFICANT CORROSION.REMEDY:OWNER TO IMMEDIATELY RETAIN NYS PE TO ASSES S THE STABILITY OF RW AND SUBMIT SIGN AND SEAL REPORT BY 10/6/2025
Dec 1, 2024 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Dec 1, 2023 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Dec 27, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DIE TO IMMINENT HAZARDOUS CONDITIONS ON EXP2 & 4 IMMED INSTALL SIDEWALK SHED AT THE NORTH EAST AND SOUTH EAST END OF THE BLDG TO PROTECT THE PUBLIC. CONDITIONS OBSERVED WERE OPENE VERT CRACK ON EXP2 THAT EXTEND FROM THE PARAPET TO THE 5FL. REMEDY: IMMED INSTALL SIDEWALK SHED AT EXP1 SOUTH EAST END
Feb 22, 2022 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Apr 29, 2021 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Oct 24, 2019 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Oct 24, 2019 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Oct 24, 2019 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Oct 1, 2019 V*-DOB VIOLATION - DISMISSED RWNRF-RETAINING WALL NONE FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
Aug 9, 2018 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 31, 2018 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 5, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 2, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Apr 3, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ON 1/30/18 DOB INSPECTOR VISTED THE SITE AND ISSUED OATH SUMMONS FOR UNSAFE FACADE CONDITIONS.ERODED MORTAR JOINTS AND SEPARATION OF FRONT FACADE WAS OBSERVED.REMEDY:IMMED.INSTALL SIDEWALK SHED TO PROTECT THE PUBLIC ON EXPOSURE#1 SHED MUST BE INSTALL WITHIN 48 HOURS(4/5/18) SUBMIT PHOTOS OF SHED TO:FACADES@BUILDINGS.NYC.GOV
Jan 18, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OWNER FAILED TO SUBMIT ACCEPTABLE 6&7 CYCLES EXTERIOR WALLS AND APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT FILED BY A REGISTER DESIGN PROF.AS REQ'D BY AC28-302 & DOB RULES AND REGULATIONS.REMEDY: SUBMIT ACCEPTABLE EXTERIOR WALLS & APPURTENANCE CRITICAL EXAMINATION TECHNICAL REPORT BY REGISTERED PROFESSIONAL TO DEPT OF BUILDINGS IMMED
Feb 8, 2017 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 19, 2016 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 2, 2015 V-DOB VIOLATION - ACTIVE BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Dec 29, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 1, 2014 V-DOB VIOLATION - ACTIVE BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Dec 5, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 31, 2013 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Dec 26, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 1, 2012 V-DOB VIOLATION - ACTIVE BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Sep 19, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 13, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 23, 2011 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 30, 2010 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 18, 2008 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 30, 2007 V-DOB VIOLATION - ACTIVE LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL LL1198-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL
Feb 15, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 26, 2004 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 31, 2002 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 1P2143
Feb 19, 2002 V*-DOB VIOLATION - DISMISSED LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL LL1081-LOCAL LAW 10/81 - ELEVATOR ELEVATOROPTIONAL
Feb 10, 1997 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 1, 1994 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 24, 1993 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 2, 1992 VP*-VIOLATION UNSERVED ECB- DISMISSED E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 20, 1991 VP*-VIOLATION UNSERVED ECB- DISMISSED E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 14, 1990 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 12, 1989 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (51)MAKE NECESSARY REPAIRS
Jul 27, 1988 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (47)LOCK.(51)REPAIR OR RENEW CAR DOOR VISION GLASS PANEL.(52) PROPERLY TAG GOVERNOR AFTER CONDUCTING 2 YEAR TEST