| Dec 1, 2024 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Aug 2, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2024 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Feb 2, 2022 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Nov 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Aug 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 15, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER FOR APPLICATION #122061650. STOP ALL WORK, MAKE SITE SAFE, CONTACT BOROUGH COMMISSIONE R'S OFFICE IMMEDIATELY |
| Jul 6, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OWNERS RESPONSIBILITY TO MAINTAIN CHURCH FOLLOWING 4 ALARM FIRE ON MAY 1,2016.ROOF TRUSSES,FRAMING&SHEATHING HAVE COLLAPSED.EAST&WEST PERIMETER WALLS ARE DAMAGED.REMEDY:OWNER TO MAKE WATERTIGHT THE TOP APPROX 5FT OF THE PERIMETER WALLS OR INSTALL TEMP ROOFING.OBTAIN PERMITS NO LATER THAN 7/19/16&ENGAGE DOB ENDORSED CONTRACTOR |
| Jul 1, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OWNERS RESPONSIBILITY TO MAINTAIN CHURCH FOLLOWING FOUR ALARM FIRE ON 5/1/16.ROOF TRUSSES&SHEATHING HAVE COLLAPSED.SOUTH GABLE MASONRY WALL IS DAMAGED&UNBRACED.REMEDY:OWNER TO INSTALL BRACING/SHORING ON SOUTH GABLE MASONRY WALL.OBTAIN PERMITS NO LATER THAN 7/19/16&ENGAGE DOB ENDORSED CONTRACTOR TO BEGIN WORK NO LATER THAN 7/22/16 |
| Jun 22, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE ON 5/01/16 THE EXTERIOR WALLS OF THE CHURCH WERE AFFECTED AND NEED TO BE MONITORED.PROVIDE TRANSIT MONITORING READINGS TWICE PER WEEK AT THE FOLLOWING 1)FACADE ALONG W25TH ST(5PTS) 2)WEST WALL (3PTS) 3)EAST WALL (4PTS).REMEDY:START MONITORING IMMED AND SUBMIT READINGS TO NYC DOB FEU BY EMAILS |
| May 12, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM.OWNERS RESPONSIBILITY TO MAINTAIN CHURCH BLDG FOLLOWING FOUR ALARM FIRE.APPRX 30% OF ROOF TRUSSES&OTHERSTRUSSES&ENTIRETY OF ROOF SLATE & SHEATHING COLLAPSED.MASONRY WALLS LEFT DAMAGED OR ONLY MARGINALLY STABLE.REMEDY:OWNER TO RETAIN NYSPE TO EVALUATE THE BLDG CONDITIONS, REPORT ON THEM.WORK TO BEGIN NO LATER THAN MAY 23, 2016 |
| May 11, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.CHURCH BLDG SUFFERED SIGNIFICANT DAMAGE FROM A FOUR ALARM FIRE.APPROX 30% OF ROOF STRUCTURE&ENTIRETY OF ROOF SHEATHING COLLAPSED.INTERIOR STONE WALL LINING IS LOOSE&IN DANGER OF FURTHER COLLAPSE.REMEDY:OWNER TO IMMED FENCE THE SITE,ERECT SIDEWALK SHEDS AT 25TH/26TH ST SIDES&REMOVE LOOSE FALLING DEBRIS HAZARDS |
| May 2, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Aug 27, 2008 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 10, 1989 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 7, 1989 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |