NYC Building Report

Manhattan East Village

129 1 Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Nov 28, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: PROVIDE 25LF OF SIDEWALK SHED AT EXP #1 (1ST AVE) TO PROTECT THE PUBLIC
Jul 10, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL THERE ARE CRACKS AT EXPOSURE 1&4 WITH MISSING MASONRY,MORTAR,LOOSE BRICKS IN VARIOUS LOCATIONS
Nov 27, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER JOB# 121084860 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK IMMEDIATELY AND PROVIDE ALL THE NECESSARY INFO TO BOROUGH COMMISSIONER
Nov 27, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BORO COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPL #120483057 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK IMMEDIATELY AND PROVIDE ALL THE NECESSARY INFO TO THE BOROUGH COMMISSIONER
Feb 9, 2011 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 9, 2011 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Oct 24, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL