Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 12, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTIO PLAN REQ'D-EXP1 HAS 2 STEEL CHANNEL BEAMS INSTALLED IN ALIGNMENT VERT ON THE LEFT SIDE FROM 2ND-5TH FLR. THE BRICK FACADE AROUND THE 5FL APPEARS TO BE LEANING INWARD. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & SUBMIT A CORRECTION ACTION PLAN BY 8/22/25. BLDG TO BE REPAIRED UNDER PERMIT START 10/13/25 |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |