Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
57 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 2, 1990 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 74-REPAIR CAR SWITCH 74A-CLEAR CAR TOP 19-FOR THE FIRST FLOOR 74B -REMOVE ALL DEBRIS FROM THE FRONT OF ALL HOISTWAY DOORS 35-REMOVE DEBR IS FROM MOTOR ROOM 74C-COVER THE HOLE IN THE CAB WALL |
| Jul 2, 1990 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 74-RENEW CAR FLOOR 74-PROVIDE COVERS FOR GATE CONTACT 19-PROVIDE A PARKING DEVICE ON THE 1ST FLOOR |
| May 9, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (21 & 24)RESHACKLE. (23)RENEW. (47)REPLACE WINDOW. (35)1ST FLOOR |
| May 9, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51) REPAIR HOLE IN CAB WALL 21 AND 24 RESHACKLE |
| Sep 26, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)CLEAN TOP OF CAR (52)PROVIDE CAPACITY PLATE (53)REPAIR PARK- ING DEVICE (54)REMOVE TOP LOCK |
| Sep 26, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (01)PROPERLY WIRE (51)DATE & TAG FOR 5 YR SAFETY TEST |