NYC Building Report

Manhattan Upper East Side-Carnegie Hill

115 East 60 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Jun 26, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 27, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS NOTED: AT 1 P ERMIT #110341719.NO 4" X6' X3/8" STEEL ANGLE INSTALLED AT REAR TO SECU RE FLOOR JOISTS UNDER FIRST FLOOR NO JOISTS ANCHARAGE SHOWN ON PLANS T O SECURE JOISTS IN MASONRY WALLS AT FRONT NEW JOIST WELDED TO STEEL AN GLES UNDER ROOF REMEDY: STOP ALL WORK PROVIDE PLANS FOR JOISTS INSTALL
Jan 27, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE FIRE RATING ON STRUCTURAL ASSEMBLIES UNDER FIRST FL OOR AT REAR TWO STORY NOTED: ALT 1 PERMIT #110341719 REMEDY: PROVIDE CODE COMLAINT FIRE PROTECTION OF FLOOR JOISTS
Oct 21, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MISCELANEOUS VIOLATIONS FAILURE TO COMPLY WITH A STOP WORK BY DOB PART IAL SWO ISSUED 7/26/08 ECB 34689432H DOB 072608CI08KP01 FOR REMOVAL OF WALLS & CEILINGS WORKERS ON SITE AT TIME OF INSPECTION REMOVING PLAST ER & LATH WALLS & CEILINGS AT APT 2R & 2F AND AS PER STATMENT BY FOREM AN HAVE BEEN DOING REMEDY: STOP ALL WORK IMMEDIALTY COMPLY WITH NOTICE