NYC Building Report

Manhattan Gramercy

113 Lexington Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Dec 12, 2006 V-DOB VIOLATION - ACTIVE A-SEU NONE CELLAR MASSAGE PARLOR W/6 BOOTHS, WAITING RM,KITCHENETTE W/SINK&WASH M ACHINE WASTE DIRECTED TO WASTE BUILTIN REAR YD STAIR,OBSTRUCTING EGRES S FROM RAR YD FIRE ESCAPE TO ST.1ST FLR RESTUARANT SEATING 30(APPROX.) W/KITCHEN & 2 REAR EXTENSIONS(10'X8" & 16'X12' APPROX.)FOR WALK IN REF RIGERATOR TORRAGE & KITCHEN&BATHRM-OPENING IN EXTERIOR WALL WAS CREATE
Dec 8, 2005 VW*-VIOLATION - WORK W/O PERMIT DISMISSED A-SEU NONE CONSTRUCTION W/O PERMITS, OF RESTAURANT, CHINESE MASSAGE PARLOR & 2 RE AR YARD ADDITIONS(10'X8',16'X12'APPROX)AT 1ST FLR.,CELLAR & CELLAR PAS SAGEWAY ELIMINATION(W)TOTAL OBSTRUCTIONS) SECONDARY MEANS OF EGRESS FO R REAR APTS. NO SECONDARY MEANS OF EGRESS FOR FRONT APTS.BECAUSE ONLY 2ND & 3RD FLRS COORRIDORS HAVE SPRINKLERS,BUT STAIRCASE DO NOT. C.O
Jan 24, 1996 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 24, 1996 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 1, 1992 V-DOB VIOLATION - ACTIVE ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Jul 18, 1989 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 18, 1989 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 18, 1989 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 18, 1989 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 18, 1989 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 18, 1989 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL