Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 TOP LEFT 4FL STONE WINDOW LINTEL W/DETERIORATION/SPALLING,ALSO TWO WINDOW LINTELS DOWN BELOW HAVE HAORLINE CRACKS PRESENT. OWNER TO RETAIN NYSPE TO EVAL THE ENTIRE BLDG, PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER BLDG, START OWRK BY 11/30/2026 |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 4, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO STOREFRONT DUE TO ADJACENT BUILDING ( 100 EAST 12 STREET MN ) WALL COLLAPSED AT 113 EAST 12 STREET MANHATTAN. |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Oct 25, 2008 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 22, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |