| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.THE OUTER WYTHE OF THE FRONT WALL@SOUTH EAST CORNER IS DETACHING@2ND&3RD FLOOR.THERE IS POTENTIAL OF BRICK FALLING.IMMED INSTALL SIDEWALK SHED AND SUPPORTED PIPE SCFFLD@FRONT FENCE TO REMAIN UNTIL ALL LOSE BRCK HAS BEEN REMVD&SECURE |
| Mar 1, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.MASONRY WALLS IN STATE OF DISREPAIR.AT FRONT OUTER WYTHE IS DISPLACING @S-E CORNER.BOWING OF WALL NOTED@FRONT WALL.CRACKS&SPALLED STUCK NOTED@SOUTH&WEST WALLS.OWNR TO ENGAGE NYS PE & CONTRACTOR TO EVAL THE BLDG&REPAIR UNDER PERMIT.FILE FOR PERMIT BY 3/20/23.SGN OFF BY 6/11/2023 |
| Mar 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMER WORK.FIRE ESCAPED ARE IN STATE OF DISREPAIR.MISSING&LOSE TRESD NOTED@FIRE ESCAPE ON THE SOUTH WALL SECOND MEANS OF EGRESS HAS BEEN COMPROMISED.IMMED EVALUATE&REPAIR ALL FIRE ESCAPES UNDER DIRECT& CNTINUOUS SUPERVISION OF PE.FILE FOR PRMT W/IN 48HRS OF WORK START |
| Mar 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMER WORK ORDER.THE OUTER WYTHE OF THE FRONT WALL HAS DISPLACED BTWEEN THE 2ND&THE 4TH FL@THE SOUTH EAST CRNR.THE WNDW SILLS&HEADERS HAVE DISPLCD.THERE IS PTENTL OF FCADE ELEMNTS FLLNG ON SDEWALK.IMMED REMOVE /SECURE THE DSPLCD ELEMENTS UNDR DRECT&CNTINUOUS SPRVSN OF NYSPE.FILE PRMTW/IN48 HRS OF WRK STRT |
| Mar 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMER WORK.EXP1(FRONT)FACADE WALLL HAD DTACHD FRM THE STRCTRLBACK UP WALL.APPRX 3IN OUTWARD BLGED@2ND&3RD FL NEAR EXP1/4 CRNR PIER.IMMED INSTILL CNSTRCTN FENCE@FULL WIDTH EXP1,W/ 10"-0" EXTNSN TO EXP2@109 MOTT ST.THE CNSTRCTN FNCE TO TAKE UP1 PRKNG LANE |
| Mar 1, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSP OBSERVED AT EXPO #1 A SECTION OF MASONRY BRICK WORK HAS PARTIALLY DISLODGED IN IMMINENT DANGER OF COLLAPSING ONTO SIDEWALK, ALSO AREA AFFECTED COMPROMISES EGRESS. AT EXPO #1/2/3 FIRE ESCAPES WITH SEVERE DETERIORATION WHERE STEPS ARE MISSING & OR PARTIALLY DETACHED COMPROMISING 2ND MEANS OF |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 5, 1991 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | P-PLUMBING NONE |