4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jan 30, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS CONTRACTOR INSTALLED TEMPORARY SHORING AT CELLAR UNDER A PPLICATION #110315533 AND #110376147 AS REQUIRED BY APPROVED SEQUENCE OF OPERATIONS BUT FAILED TO PROVIDE DETAILED TEMPORARY SUPPORT DRAWING S AS REQUIRED REMEDY; STOP ALL WORK CONFORM TO A APPROVED DOCUMENTS |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |