NYC Building Report

Manhattan East Village

109 East 9 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

21 records

Date Status Type Summary
Nov 6, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL REQUESTING AN ENGINEERING REPORT DUE TO BROKEN WALLS AND A BROKEN FLOOR EXPOSING WOOD JOISTS OBSERVED IN APT. #4C. THESE POTENTIALLY HAZARDOUS CONDITIONS HAVE RENDERED THE ENTIRE APARTMENT 4C UNSAFE TO ENTER AND OCCUPY. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE PROPERTY.
Apr 14, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DOB HEREBY ORDERS YOU TO STOP ALL WORK IMMEDIATELY DUE TO INTENT TO REVOKE ALL APPROVALS AND PERMITS UNDER JOB #M01181265-I1 .
Apr 14, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ALL WORK AND PERMITS IN CONNECTION WITH APPLICATION #M01181265-I1 HAS BEEN REVOKED
Apr 1, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ALL WORK AND PERMITS IN CONNECTION WITH APPLICATION #M01098599-I1 HAS BEEN REVOKED
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Aug 14, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.MAIN BLDG&CRCKD 3RDFL HEADER W/INADEQUATE CONNECTION TO TRIMMER WHICH WAS SUPPORTNG INTERIOR WALL ADJ TO STAIRS.FLOORS SEVERELY SLOPNG TOWARDS.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&FILE RPAIR DWGS W/DOB.PERM RPAIRS TO BEGIN UNDR PRMT 10/14/24&CMPLTD&SGND OFF
Aug 14, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.MAIN BLDG W/WOOD JOIST&CRCKD 3RDFL HEADER W/ INADEQUATE CONNECTION TO TRIMMER,WHICH WAS SUPPORTNG INTERIOR WALL ADJ TO STAIRS.FLOORS SEVERELY SLOPNG TOWARDS CENTER STAIRS@2ND THRU 5FLRS OWNR TO IMMED RTAIN NYSPE&LICENSED GC TO SHORE BLDG,AS REQ'D,UNDR FULL TIME CONT,NYSPE SUPERVISION/DIRECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 15, 2014 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 15, 2014 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Dec 19, 1994 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 19, 1994 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL