12 records

Date Status Type Summary
Sep 27, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN EXTERIOR BUILDING IN A COMPLIANT MANNER.AS NOTED I OBSERVED ON EXP1 EAST ELEV AND EXP2 SOUTH ELEV,SEVERELY DAMAGED SPALL ING,ERODED,DISINTEGRATED MASONRY LINTELS AND SILLS AT SEVERAL FLOORS.R OTTED METAL CORNIC IN SOME AREAS.REMEDY:REPAIR AND/OR REPLACE ALL DAMA GED FACADE AND APPURTENANCES
May 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SEVERELY SPALLED/SPALLING STONE WORK, DEFECTIVE/DAMAGE LINTELS AND SILLS AND DETERIORATED CORNICE. REMEDY: REPAIR/REPLACE
Jan 11, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO THE FOLLOWING CONDITION:SEVERELY SPALLED/S PALLING STONE WORK;DEFECTIVE/DAMAGED LINTELS & SILLS AND DETERIORATED CORNICE.REMEDY:IMMEDIATELY PROVIDE APPROVED SAFETY MEASURES AND MAKE REPAIRS UNDER DIRECT SUPERVISION OF LICENSED PROFESSIONAL
Jan 11, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.SEVERLY SPALLED /SPALLING STONE WORK;/DEFECTIVE/DAMAGED LINTELS&SILL AND DETERIORATED CORNICE.REMEDY FIX AND/OR REPLACE
Sep 8, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS& FACADE.OBSERVED SPALLED/ SPALLING STONEWORK.DEFECTIVE/DAMAGED LINTELS&SILLS&DETERIORATED CORNIC CORNICE REMEDY:MAINTAIN BUILDING EXTERIOR WALLS& FACADE.REPAIR/REPLACE DAMAGED FACADE
Feb 16, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED:AT TIME OF INSPECTION OBSERVED ON EXPOSURES#1&2SPALLING MASONRY@ WINDOW SILLS AND AT DETERIORATING WINDOW SURROUND ON SEVERAL FLOORS AND LOCATIONS REMEDY:MAINTAIN BUILDING EXTERIOR WALLS,REPAIR DAMAGED,DEFECTIVE MASONRY AS PER CODE
Nov 22, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED SPALLING STONE LINTELS AND DISINTEGRATING FACADE THROUGOUT BLDG AND ON ALL EXPOSURES REMEDY: MAINTAIN BLDG AND REPAIR ALL DEFECTS ON ALL EXPOSURES
Aug 12, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MANTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED: AT TIME OF INSPECTION I OBSERVED ON SEVERAL FLOORS ON EXP#1 EAST ELEVATION & EXPOSURE#2 SOUTH ELEVATION SPALLING DISINTERATING MASONRY AT LINTELS, SILLS &SPANDRELS.REMEDY:REPAIR DISINTEGRATING MASONRY ON ALL EXPOSURES
May 10, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BUILDING IN COMPLIANT MANNER-AT TIME OF INSPECTION OBSERVED DETERIORATION OF FACADE AT EXP1 EAST ELEV AND EXP2 SOUTH ELEV. DAMAGE LINTEL AND SILLS AND MASONRY WALL THROUGHOUT. REMEDY: REPAIR AND/OR REPLACE
Aug 3, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 313186(053020CLLF01AV) ISSUED ON 05/30/2020. AS OF 08/03/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER
Jun 24, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG EXTERIOR FACADE/WALLS AND APPURTENANCES. AT TIME OF INSP OBSERVED AT EXP1 EAST ELEVATION, BROKEN/SPALLED, DAMAGED WINDOW SILL, SPALLED STONE AT BLDG CORNER, SPALLED, DAMAGED WINDOW SILL AT EXP2 REMEDY: MAINTAIN EXTERIOR BLDG FACADES AS PER 1 RCNY 103-04
May 30, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING MASONRY FACADES. AT TIME OF INSPECTION OBSERV SECTION OF DEFECTS CRACKS/SPALLED AND DETERIORATED MASONRY FACADE WERE OBSERVE AT 3 STORIES FACADE AT MULTIPLE LOCATIONS AND FLRS AT ALL STREET EXPOSURES. SOUTH AND EAST FACADE. REMEDY:MAINTAIN EXT FACADE, PROVIDE AND MAINTAIN DAFETY MEASURES. COMPLY WIT CODE