Manhattan Upper West Side (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
25 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 2, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 7, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE SIDEWALK SHED AT EXPOSURE #1 NORTH ELEVATION (APPROXIMATELY) 55 LINEAR FEET) |
| Jul 5, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO.EXP4 HAD A GAP TOWARDS THE ROOF ADJACENT TO NEIGHBOR BLDG.BLDG APPEARD TO BE LEANING TOWARDS EXP2.ON THE INTERIOR,DIAGONAL CRACKS WERE OBSERVD ALONG THE WALLS NEXT TO THE COMMON STAIR.FAIL TO COMPLY W/COMMISH ORDR#341370(060723FEU10701ZT)RQRING OWNR INSTLL MONITOR DEVICE.IMMED COMPLY W/CMMISH ORDR#341370 |
| Jun 7, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.1.THE FACADE ON EXP1 HAD SEVERELY DETERIORATED.SOME BROWNSTONE FACADE APPEARD TO BE LOOSE.THE WNDW LINTEL&SILL HAD CRACKED WNDOW FRAMES HAD NOT DTERIORATD,2.BLDG HAD VISIBLE LEAN TOWARDS EXP2.OWNR TO IMMED HIRE A NYS PE TO EVAL ENT BLDG,DET STRCTURAL STBILITY,&PREPARE/ FILE RPAIR DRWNGS.BLDG TO BE RPAIR UNDR |
| Jun 7, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO.EXP4 HAD A GAP TOWARDS THE ROOF ADJACENT TO NEIGHBOR BLDG.BLDG APPEARED TO BE LEANING TOWARDS EXP2.ON THE INTERIOR,DIAGONAL CRACKS WERE OBSERVED ALONG THE WALLS NEXT TO THE COMMON STAIR.OWNR TO IMMED HIRE MONITORING COMPANY TO INSTALL OPTICAL MONITOR DEVICE,&CRACK MONITOR DEVICE FOR CONTINUOUS MONITORING |
| Apr 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG-THE BUILDING STRUCTURE IS LEANINGOUT OF PLUMB TOWARDS EXP2.GAP SEPARATION OBSERVED BETWEEN 104 W 83 ST& NEIGHBORING BLDG@ EXP4 WHICH INCREASES VERTICALLY TO ROOF BOTH STRCT.IMMED RETAIN NYSPE-INSPECT ENTIRE STRUCTURAL STABILITY.PE TO PROVD DELTD RPT NLT 5/3/23 TO FORENSICENG@BUILDINGS.NYC.GOV |
| Apr 18, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE.AT EXPOSURE#1(NORTH EL) OBSERVED CRACKED/SPALLING/CRACK STUCCO IN SEVERAL LOCATION .ALSO OBSERVED DAMAGED WINDOW SILLS IN MULTIPLE LOCATIONS.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES AT EX#1(NORTH EL)TO SECURE/PROTECT THE PUBLIC AND REPAIR THE DEFECTIVE OF FACADE |
| Dec 1, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISES 5-STORY SEMI-ATTACHED MASONRY BUILDING. BUILDING SETTLED APPROXIMATELY 10" ON TOP WHERE AS BOTTOM 0" GAP, UNPLUMBED & LEANING TOWARD EAST. INTERIOR STRUCTURAL WALL HAS SIGN OF VARIOUS CRACKS, PATCH & DISREPAIR CONDITIONS BY THE STAIRCASE WALL. ALSO EXTERIOR DISREPAIR CONDITIONS ON FRONT FACADE WITH SPELLING & CRACKS. |
| Mar 2, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 5, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 10, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 14, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO HIRE A PROFESSIONAL SUR VEY TEAM TO PERFORM REGULAR MONITORING OF BUILDING. PLAN OF ACTION TO BE SUBMITTED TO ERIC HOYT FOR REVIEW BY 3/3/15 AND FIRST REPORT TO BE SUBMITTED BY 3/13/15. NOTHING HAS BEEN RECEIVED |
| Apr 8, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 15, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN,5STORY O.L.T. BUILT 1900 BLDG DEFLECTS EAST.OWNER TO HIRE PROFRESSIONAL SURVEY TEAM TO PERFORM REQULAR MONITORING OF BLDG DEFLECTION PROPOSED MONITORING MEANS METHOD &SCHEDULE TO BE SUBMITTED TO ERIC, FIRST REPORT TO BE SUBMITTED BY 03/13/15 |
| Jun 17, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN |
| Jun 17, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN: 5 STORY OLD LAW TENEMENT CA. 1900. DEFLECTING EAST REMEDY: OWNER TO HIRE NYS PE TO PERFORM FULL STRUCTURAL INVESTIGATION OF BLDG, PROVIDE REPORT TO ERIC HOYT, FEU, 280 BROADWAY, NY, NY ENG'R TO PROVIDE PLANS FOR NEEDED REPAIRS AND FILE FOR PERMIT TO REPAIR NO LATER THAN 07/24/14 |
| Feb 10, 2009 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 18, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 18, 1997 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |