NYC Building Report

Manhattan Harlem (North)

104 West 139 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

41 records

Date Status Type Summary
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.DUE TO FIRE ON 2/5-2/6/25: REAR ROOD PRTLLY CLLPSD.OPEN ROOF DMGD@REAR HALF OF BLDG 3RDFL JOISTS PRTLLY DTACHD@REAR APT.WATER DMG THROUGHOUT.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG&FULL RPAIR DWGS W/DOB BLDG TO PERM RPAIRD UNDR PRMT STRTNG BY 4/14/25&CMPLTD/SGND OFF
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG.DUE TO FIRE THAT OCCRD 2/5-2/6/25:1.FIRE OUT@ FRNT OF ROOF.INTERIOR WALL&CEILNG PRTLLY CLL[SD@5THFL APT#9&10 APT#1, 3,6 HAD ENTRANCE DOORS MASONRY SEALED.OWNR TO RTAIN NYSPE TO EVAL ENT VLDG&FILE RPAIR DWGS W/SOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 3/31/25
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.REAR ROOF PRTLLY CLLPSD,OPEN,AT RISK OF FRTHR CLLPSE.ROOF FIRE CUTS THRU-OUT.1STFL THRU 5THFL JOIST AND/OR INTWOOD PARTITION WALLS FIRE DMGD@REAR HALF OF BLDG.3RDFL JOISTS PRTLLY.OWNR TO IMMED RETAIN NYS PE,DEMO GC&ASBESTOS GC TO:1.NYS PE&ASBESTOS GC TO SBMT MEANS&METHDS TO FEU&DEP FOR REVIEW&APPRV
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.DUE TO FIRE ON 2/5 TO 2/6/25:REAR ROOF PRTLLY CLLPSD,OPEN,AT RISK OF FURTHER CLLPSE.ROOF FIRE CUTS THRU-OUT 1ST THRU 5TH FL JOISTS &/OR INT WOOD PARTITION WALLS FIRE DMGD@REAR.OWNR TO IMMED RTAIN GC TO INSTLL TGHTBRD FENCE TO ENCLOSE THE SDWLK&PRKNG LANE IN FRNT OF FULL WIDTH OF 106 W.139 ST
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON -COMPLIANT BUILDING SUSTAINED EXTENSIVE STRUCTU RAL DAMAGE DUE TO FIRE WITH PARTIALLY COLLAPSED ROOF , MISSING WINDOW S , SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE MUST BE MAINTAIN IN A CODE COMPLIANT MANNER
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT BUILDING SUSTAINED EXTENSIVE DAMAGE D UE TO FIRE WITH PARTIALLY OPEN ROOF , MISSING WINDOWS , SMOKE AND WATE ER DAMAGE THROUGHOUT STRUCTURE MUST BE MAINTAIN IN CODE COMPLIANT MANNER
Feb 6, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PREMISES HAS SUSTAINED DAMAGED DUE TO FIRE FROM IST FLOOR THROUGH ROOF WALLS AND CEILING DAMAGED AND IN DANGER OF COLLAPSE, JOIST CHARRED , ROOF OPEN TO THE ELEMENTS OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC GOV 718-286-3460 WITHIN 30 DAYS ADDRESSING ALL CONDITIONS
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 6, 2006 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 13, 2004 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 19, 2003 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 17, 1992 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 17, 1992 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 17, 1992 V*-DOB VIOLATION - DISMISSED ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Mar 17, 1992 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL