NYC Building Report

Manhattan Greenwich Village

103 Mac Dougal Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

12 records

Date Status Type Summary
Oct 4, 2023 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 15, 2023 V-DOB VIOLATION - ACTIVE LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Jan 25, 2023 V-DOB VIOLATION - ACTIVE LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Mar 4, 2022 V-DOB VIOLATION - ACTIVE LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Oct 30, 2020 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9C UNSAFE REPORT FILED
Oct 30, 2020 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 8C UNSAFE REPORT FILED
Apr 30, 2019 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Feb 12, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL COMMISSIONER'S REQUEST FOR CORRECTIVE ACTION. FIRE ESCAPES @ COURTYARD TERMINATE TO ONE STORY ROOF, STAIRCASE THAT LEADS TO ADJACENT PROPETY 9 MINETTA STREET HAS A WOODEN WALL ERECTED PREVENTING ACCESS TO AREA OF REFUSE
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Dec 31, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED