DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jul 15, 2023 V-DOB VIOLATION - ACTIVE COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 12, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE R DUE TO A FIRE. THE BUILDING SUSTAINED FIRE DAMAGE THE BUILT-UP ROOF. THE METAL CORNICE ABOUT 12 SECTION IS MISSING FIRE CHARRED, AND OTHER SECTIONS CUT AND DEFECTIVE. THE FIRE WAS CONTAINED ON THE ROOF. ENDERED NON COMPLAINT
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED