| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 21, 2022 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARAPET AND FACADE REPLACEMENT WORK ONGOING WITHOUT A PERMIT |
| Mar 16, 2020 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Feb 16, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Mar 12, 2012 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |