NYC Building Report

Brooklyn East New York (North)

BIN 3380481

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-03976-0023), so they can include other buildings on the same lot.

14 records

Date Class Status Apartment Summary
Feb 23, 2025 B VIOLATION DISMISSED 2NDFLO § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 23, 2025 C VIOLATION DISMISSED 2NDFLO HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 23, 2025 C VIOLATION DISMISSED 2NDFLO HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2009 B NOV SENT OUT 2 SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH
Aug 25, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE JAMBS AT DOOR IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH
Aug 25, 2009 B NOV SENT OUT 2 SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... 12 SQ. FT. AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH
Aug 25, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING WHEN IT RAINS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH
Aug 24, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR FRAME IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY
Aug 24, 2009 B NOV SENT OUT 2 SECTION 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
Aug 24, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
Aug 24, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
Aug 24, 2009 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY
Apr 29, 2008 C NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK LEAKY ROOF IN THE 2nd BEDROOM 2 FROM EAST LOCATED AT APT 2, 2nd STORY
Apr 29, 2008 B NOV SENT OUT 2 SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 2nd BEDROOM 2 FROM EAST LOCATED AT APT 2, 2nd STORY