Brooklyn East Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Aug 18, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 27, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED ALONG EXPOSURE 1 TO PROTECT THE PUBLIC |
| May 26, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:DUE TO FIRE 5/25/21 ROOF PARTLY COLPSD&PARAPET IS IMPROP SUPPORTD EXP2 PRTYWALL WITH 97 MORGAN AVE WAS DMGD FRM 1ST TO ROOF.FIRE PROTECT OF THIS WALL HAS BEEN BREACHED.THIS REPRESENTS A DANGER TO THE PUBLIC OWNER MUST HIRE NYSPE AND ENDORSED CONTRACTOR TO EVALUATE ENTIRE BLDG OBTAIN PERMITS TO REPAIR BY 07/07/2021.SIGN OFF REPAIRS BY 08/30/2021 |
| May 25, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE BUILDING DUE TO FIRE AT 99 MORGAN AVE BK. A FULL VACATE ORDER ISSUED ON ENTIRE BUILDING. |