DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 17, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2WALL IS INDEPENDENT ABUTTNG THE ADJ BLDG.MAIN 3 STORY WAS RACKD&LEANING TOWARDS EXP4.EXP1 VINYL SIDNG WAS BULGNG OUT TOWARDS THE SDWALK@THE 1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 341656 072924FEU302PN DATED JULY 29, 2024 |
| Jul 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2WALL IS INDEPENDENT ABUTTNG THE ADJ BLDG.MAIN 3 STORY WAS RACKD&LEANING TOWARDS EXP4.EXP1 VINYL SIDNG WAS BULGNG OUT TOWARDS THE SDWALK@THE 1STFL.OWNR TO RTAIN A NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE RPAIR UNDR PRMT UNDR PRMT STRTNG 9/16/24&CMPLTD/SGND OF 11/1 |
| Nov 25, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED BUILDING STRUCTURE (WOOD FRAME ENTIRE SPAN) LEANING OUT OF PLUMB, BETWEEN EXPOSURE 2 WALL AND ADJACENT BUILDING WALL AT 3 RD FLOOR LEVEL SPACE APPROX. 8" WIDE. OBSERVED SPACE BETWEEN STAIRCASE AND WALL AT MULTIPLE LOCATIONS |
| Aug 24, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 13, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 1, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 24, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 7, 2014 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 26, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN:3 STORY TIMBER FRAMED RESIDENTIAL BLDG CA.1905 HAS SUBSTANTIAL RACKING TO NORTH.DEFLECTION MOST PROMINENT@1ST FL ALONG FRONT FACADE.LIKELY TO COLLAPSE IF LEFT IN THIS CONDITION. REQUIRE PE INSPECT&SUBMIT REPORT BY 4/1/14 WITH RECOMMENDATIONS FOR REPAIR. PLANS REQUIRED TO FILE WITH DOB&PERMIT TO START REPAIRS NO LATER THAN 5/1/14 |