NYC Building Report

Brooklyn East New York-City Line

964 Belmont Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Mar 30, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM DUE TO 3 ALARM FIRE ON 02/28/18.BLDG IS 4ST+C SEMI ATTACH WOOD FRAMED W/EXT MASONRY WALLS,MIX USE BLDG.FIRE DAMAGE TO 2NDFL JOISTS OVER STORE&ALL UNITS ALONG 2&3 LINES.PARAPET ALONG BELMONT AVE PART COLL.MULT HOLES IN ROOF.REMEDY:OWN OBT PE ENG'R EVAL BLDG.PROV RPRS UND PERM.OBT PERM BY 4/30/18.PERM SIGNOFF NO LATER THAN 10/1/18
Mar 30, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM.MEANS OF EGRESS IN ACCORD W/NYC FIRE CODE.BLDG 4ST+C SEMI ATTACH WOOD FRAME W/EXT MASONRY WALLS,MIX USE BLDG.AIR COND INSTALL IN WINDOW ON FIRE ESCAPE.KEY ENTRY DOOR HARDWARE INSTALL ON BEDROOM DRS OBSTRUCT EGRESS IN MULT APTS.REMEDY:OWN HIRE DSGN PROF EVAL MEANS OF EGRESS FOR BLDG&MAKE CODE COMPLIANT,PRIOR TO OCCUPY BLDG&NO LATER THAN 4/16/18
Feb 28, 2018 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK DUE TO 3 ALARM FIRE 2/28/18.PREM IS 4ST+PART BSMT/PART CELL, MIX USE SEMI ATTACH BLDG.WOOD FRAME W/EXT BRICK BEAR WALLS.APPROX 20FT OF EXP 1 PARAPET COLL&REMAIN PARAPET IS LEAN INWARD.REMEDY:IMMED INSTALL SIDEWALK SHED ALONG ENTIRE STREET FRONTAGE @EXP1&4.PROV TEMP ROOF OVER OPEN HOLES IN ROOF.FILE FOR PERM W/2 DAYS OF WORK START
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED