Brooklyn Sheepshead Bay-Manhattan Beach-Gerritsen Beach
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 25, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. UNSAFE CONDITION NOTED AT EXP#3 (REAR YARD) RETAINING WALL AT WATER EDGE CRACKED & LEANING TOWARDS WATER. EXCAVATED TRENCH APPROX. 5FT DEEP ALONG LENGTH OF THE WALL LEAVING ITS STRUCTURAL INTEGRITY QUESTIONABLE. POSES HAZARD OF POTENTIAL COLLAPSE INTO WATER AFFECTING |
| Aug 23, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT A TIME OF INSPECTION OBSERVED AT EXP.3/REAR YARD, RETAINING WALL IS IN STATE OF DISREPAIR WITH SEVERAL CRACKS, BULGING AND IN DANGER OF COLLAPSE. STRUCTURAL INTEGRITY OF THE RETAINING WALL IS QUESTIONABLE AND IS CREATING A HAZARD TO ANYONE ON THE REAR YARD. |
| Aug 23, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT A TIME OF INSPECTION OBSERVED AT EXP.3/REAR YARD, MORE THEN 5FT OF DIRT HAS BEEN REMOVED FROM THE RETAINING WALL WITH SHORING IN PLACE. AS PER DOB RECORDS NO PERMITS ON FILE FOR SCOPE OF WORK. 50% OF WORK DONE. |