Brooklyn East Flatbush-Remsen Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION |
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| May 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-BLDG SUSTND FIRE DMG-DEBRI THRUOUT.COLPSD/DMG INTERIOR FINSHES CHARD 1,2FL&ROOF FRM,OPN WNDWS&ROOF.2FL TRIMER JNT FAILD BENEATH KCHN/ BATH OF REAR APT.BLDG TEMP SHORED/STABILZE &SEALED PER COMMISH ORDER# 121621FEU31701IK.OWNER TO RETAIN NYSPE & DOB CONTRCTR TO EVALU ENTIRE BLDG & RPR UNDER PRMT.FILE APP FOR RPRS BY 7/1/22.CMPLT BY 6/1/23 |
| Feb 15, 2022 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | FULLY DEMOLISH THE BUILDING. COORDINATE ALL WORK WITH FDNY |
| Dec 16, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.FOLLOWING A FIRE THAT OCCURED ON 12/15/2021, COMMISH ORDER#121621FEU31701IK WAS ISSUED FOR EMGCY WRK.AS OF 01/05/22 OWNR HAS NOT RETAINED CONTRACTOR OR BEGUN WRK REQUIRED BY ORDER.FDNY SEARCHES REMAIN OUTSTANDING.COMPLY W/COMMISH ORDER#121621FEU31701IK |
| Dec 16, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK-BLDG SUSTND FIRE DMG-DEBRI THRUOUT.COLPSD/DMG INTR FINSH CHARD 1,2FL&ROOF FRM,OPN WNDWS&ROOF.2FL TRIMER JNT FAILD BENEATHKCHN/ BATH ROOM OF REAR APT AND AT RISK OF COLLAPSE.OWNR RETAIN NYSPE&CNTRCT -IMMED DESGN&INSTL TEMP SHORNG&STABL FLR/RF FRM,RMV DBRI,INSTL TEMP RF DCK&MEMBRN,PE SUB DAIL RPT |
| Dec 15, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED EXTENSIVE FORE DAMAGE THROUGHOUT THE ENTIRE BUILDING. SEVEREL Y BUNRT JOIST WITH PARTIAL FLOOR COLLAPSE |
| Dec 15, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 25, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |