9505 Church Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

12 records

Date Status Type Summary
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
May 24, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM-BLDG SUSTND FIRE DMG-DEBRI THRUOUT.COLPSD/DMG INTERIOR FINSHES CHARD 1,2FL&ROOF FRM,OPN WNDWS&ROOF.2FL TRIMER JNT FAILD BENEATH KCHN/ BATH OF REAR APT.BLDG TEMP SHORED/STABILZE &SEALED PER COMMISH ORDER# 121621FEU31701IK.OWNER TO RETAIN NYSPE & DOB CONTRCTR TO EVALU ENTIRE BLDG & RPR UNDER PRMT.FILE APP FOR RPRS BY 7/1/22.CMPLT BY 6/1/23
Feb 15, 2022 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE FULLY DEMOLISH THE BUILDING. COORDINATE ALL WORK WITH FDNY
Dec 16, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER.FOLLOWING A FIRE THAT OCCURED ON 12/15/2021, COMMISH ORDER#121621FEU31701IK WAS ISSUED FOR EMGCY WRK.AS OF 01/05/22 OWNR HAS NOT RETAINED CONTRACTOR OR BEGUN WRK REQUIRED BY ORDER.FDNY SEARCHES REMAIN OUTSTANDING.COMPLY W/COMMISH ORDER#121621FEU31701IK
Dec 16, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WRK-BLDG SUSTND FIRE DMG-DEBRI THRUOUT.COLPSD/DMG INTR FINSH CHARD 1,2FL&ROOF FRM,OPN WNDWS&ROOF.2FL TRIMER JNT FAILD BENEATHKCHN/ BATH ROOM OF REAR APT AND AT RISK OF COLLAPSE.OWNR RETAIN NYSPE&CNTRCT -IMMED DESGN&INSTL TEMP SHORNG&STABL FLR/RF FRM,RMV DBRI,INSTL TEMP RF DCK&MEMBRN,PE SUB DAIL RPT
Dec 15, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED EXTENSIVE FORE DAMAGE THROUGHOUT THE ENTIRE BUILDING. SEVEREL Y BUNRT JOIST WITH PARTIAL FLOOR COLLAPSE
Dec 15, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jul 25, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED