Brooklyn East Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 10, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | COMPLY WITH COMMISSIONER'S ORDER THE PERMIT HOLDER OF RECOR D HAS IN FORMED THE BKLYN BOROUGH COMMISSIONER'S OFFICE TO RESOLVE THIS ISSUE'S |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Apr 22, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBTAIN ANY NECESSARY PERMITS TO MAKE REPAIRS TO THE SATISFACTION OF TH E NYC BUILDINGS DEPARTMENT |
| Jan 20, 1999 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |