Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
16 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 28, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN PROPERTY IN A SAFE/CODE-COMPLIANT MANNER.3-STORY BLDG W/DETERIORATED BRICK WALLS, IMPROPERLY ANCHORED FLOORS,&INADEQUAT BRACING.TEMP STABILZATN DONE;NON-COMPLIANT ELEMENTS REMAIN. REMEDY: COMPLY W CODE; INSPECT SITE BIWEEKLY4STRUCTURAL CHANGES 'TIL COMPLIANT . RPTS BY NYS PE.NOTIFY DOB OF SIGNIFICANT MOVEMENT |
| Mar 22, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | VIO24-50337 |
| Mar 22, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL2MAINTAIN PROP IN SAFE,CODE COMPLIANT MANNER.3-STY BLDG W.DETERIOR TD EXTERIOR BRICK MASONRY WALLS IMPROPERLY ANCHORED TO FLS & LACKING ADEQUATE TEMPORARY BRACING. REMEDY: HIRE NYS PE TO EVALUATE WALLS: CONDITION & STABILITY.DOCUMENT HAZARDS + RESOLUTION.SUBMIT RPRT 2 DOB BY 03/27/24 |
| Mar 22, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGNCY WRK:3-STORY WOOD/STEEL JOIST BLDG W.DETERIORATED &UNSTABLE EX TERIOR WALLS, COMPROMISD LATERAL SYSTEM, DANGR OF FURTHER.COLLAPSE REMEDY: COMPLY W CODE. RETAIN NYS PE, CS &GC.STABILZE EXT.WALLS,SAFE GRD SITE F/T PE,CS SUPRVSN RQD.SUBMT DOCS & RPTS |
| Mar 22, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL2MEET MIN.REQS(AC28-101.2)SET IN BC 1814.1 FOR SUPORTOFEXCAVATION DESIGN. BC 1814.1 MANDATES ENGINEER 4 PROTECTN,UNDERPINNING SHEETING & BRACING. APPLICANT DOESN'T MEET, AS REGISTERED ARCHITECT. REMEDY: COMPLY W CODE,DESIGN APPLICNT 4SUPORT OF EXCAVTN TO WITHDRAW & BE REPLACED BY QUALIFID PE.SUBMIT REPLACEMNT DOCS BY 4/5/24 |
| Jun 21, 2023 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Apr 21, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1: IMMEDIATELY PLACE A SHED ON THE EXP 2 - EXP 3 CORNER APPROX 15' EAC H SIDE . 2. IMMEDIATELY SEAL THE BASEMENT, PARLOUR( FIRST FLOOR ) AND DOOR OPENINGS |
| Apr 13, 2022 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Apr 13, 2022 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Aug 5, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMMEDIATELY SECURE THE PARLOR FLOOR AND THE BASEMENT DOOR WITH CHAINS AND OR SHEETS OF PLY AND RESECURE THE EXISTING TIGHT BOARD FENCE ALONG MACON AVENUE |
| Jan 6, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 11, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 22, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM:RESID BLDG IN STATE OF DISRPAIR.PORTICO & FRNT COLLAPSED,CORNCE OF FRNT WALL PARTLY MISSNG.STUCCO OF EAST WALL SPALLNG AND MISSNG.CRNR OF SOUTH AND EAST WALL DETERIOR & BRICK HAS FALLEN.BULGING REAR WALL AND LEANING PARAPET.OWNR TO ENGAGE NYSPE AND CONTRACTOR TO REPAIR BUILDING UNDER PERMIT.FILE FOR PERMIT BY 01/01/2021.START BY 02/01/2021 |
| Oct 22, 2020 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Oct 20, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL AN APPROXIMATE TOTAL OF 20 LINEAR FEET OF TIGHT BOARD FENCE TO PREVENT UNAUTHORIZED ACCESS AND SAFEGUARD THE PUBLIC |
| Aug 12, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AT TIME OF INSPECTION IT WAS OBSERVED THAT EXTERIOR WALL WAS IN STATE OF DISREPAIR WITH MISSING LOOSE DISLODGE BRICK AT EXPOSURE 2 AND 3 CORNER IN ADDITION WITH PORTICO IN DISREPAIR WITH LOOSE LEANING AND MISSING SECTION |