Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Aug 6, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BC ORDERS TO RESTORE RESIDENTIAL UNITS TO HABITALBE & CODE COMPLIANT CONDITION.FILE PAA FOR ALT1#321323796,SUBMIT DRAWINGS&OTHER NECESSARY DOCS BEFORE 8/17/18.OBTAIN PERMITS ON/BEFORE 8/31/18.BEGIN WORK ON JOB #321323796 ON |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Mar 30, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG.TIMB BEAM @LOT FLR FRAMING LEVEL(BSMT CEILING)SUPPORT BY ROTTED TIMB POSTS EMBEDDED IN OR ADJ TO WALLS.CHIMNEY ABOVE HIGH ROOF @EXP4 LEAN OUT INTO ADJ PROP.COMPROMISED EGRESS PATH FROM EXP3 FIRE ESCAPE.REMEDY:TEMP SHORE TIMB BEAM.BRACE OR DEMO LEAN CHIMNEY.PROV EGRESS PATH FROM EXP3 TO STREET.OBT PERM BY 4/13/18.COMP WRK 5/11/18 |
| Jan 23, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMM ORDERS THAT THE FOLLOWING CORRECTIVE MEASURE BE TAKEN TO ADDRESS UNLAWFUL CONDITIONS@THE SUBJECT PREMISES 1)RESTORE SECONDARY MEANSOF EGRESS TO THE RESIDENTIAL UNITS 2)PERFORM SUCH WORK&OBTAIN ANY PERMIT NECESSARY TO RESTORE RESIDENTIAL UNITS TO CODE-COMPLAINT CONDITIONS 3) CONFORM TO APPROVED PLANS AND/OR FILE PAA TO ADDRESS AS BUILT CONDITIO |
| Apr 7, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 7, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 31, 2004 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 16, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |