NYC Building Report

Brooklyn Clinton Hill

928 Fulton Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-02013-0038), so they can include other buildings on the same lot.

9 records

Date Class Status Apartment Summary
May 25, 2011 C NOV SENT OUT Not available § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING AND ASSEMBLY AT FRONT ENTRANCE DOOR FROM STREET TO BUILDING , 1st STORY
May 25, 2011 B NOV SENT OUT Not available § 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSE HOLD ITEMS AT PUBLIC HALL, 3rd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE -- CERAMIC TILES ON FLOOR IN THE BATHROOM LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR -- CEILING AND WALLS IN THE KITCHEN LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR -- CEILING AND WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR -- CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE -- WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3, 2nd STORY
Nov 27, 2008 B NOV SENT OUT 3 HMC ADM CODE: § 27-2018.4 ABATE THE NUISANCE CONSISTING OF VERMIN -- MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY