NYC Building Report

Brooklyn Greenpoint

924 Manhattan Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Sep 18, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REPAIR APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED ALONG MANHATTAN AVENUE TO SAFEGUARD THE PUBLIC
Sep 18, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
Sep 17, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT DUE TO A VEHICLE IMPACTING SIDEWALK SHED AT EXPOSURE #1 MANHATTAN AVE COMPROMISING THE SIDEWALK SHED STRUCTURE LEAVING VERTICAL UPRIGHT POLES DISPLACED/LEANING AND CROSS BRACES COMPROMISED (BENT) PUSHING OUT OF ALIGNMENT
Aug 27, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REPAIR SIDEWALK SHED, 4 VERTICAL POSTS OF THE SIDEWALK SHED ARE OUT OF PLUMB LEANING INTO THE SIDEWALK
Aug 24, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING BUILDING CONDITIONS. DEFECTED CORNICE AT EXPOSURE 2 AND EXPOSURE 3. CRACK/STEP CRACK DAMAGED STUCCO AND SPALLING BRICKS AT EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE
May 9, 2022 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY INSTALL A SIDEWALK SHED ALONG EXPOSURE 1 KENT STREET APPRO XIMATELY 90.0LF AND ALONG EXPOSURE 2 MANHATTAN AVENUE APPROXIMATELY 35.0LF
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 12, 1998 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED