Brooklyn Greenpoint
924 Manhattan Avenue, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 18, 2026 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED ALONG MANHATTAN AVENUE TO SAFEGUARD THE PUBLIC |
| Sep 18, 2026 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Sep 17, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO A VEHICLE IMPACTING SIDEWALK SHED AT EXPOSURE #1 MANHATTAN AVE COMPROMISING THE SIDEWALK SHED STRUCTURE LEAVING VERTICAL UPRIGHT POLES DISPLACED/LEANING AND CROSS BRACES COMPROMISED (BENT) PUSHING OUT OF ALIGNMENT |
| Aug 27, 2026 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR SIDEWALK SHED, 4 VERTICAL POSTS OF THE SIDEWALK SHED ARE OUT OF PLUMB LEANING INTO THE SIDEWALK |
| Aug 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED THE FOLLOWING BUILDING CONDITIONS. DEFECTED CORNICE AT EXPOSURE 2 AND EXPOSURE 3. CRACK/STEP CRACK DAMAGED STUCCO AND SPALLING BRICKS AT EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE |
| May 9, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMMEDIATELY INSTALL A SIDEWALK SHED ALONG EXPOSURE 1 KENT STREET APPRO XIMATELY 90.0LF AND ALONG EXPOSURE 2 MANHATTAN AVENUE APPROXIMATELY 35.0LF |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 12, 1998 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |