NYC Building Report

Brooklyn Gravesend (East)-Homecrest

920 Homecrest Court, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

3 records

Date Status Type Summary
Aug 12, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL FULL BACKFILL AND GRADE TO PER-CONSTRUCTION CONDITION. FILL GAP BEHIND CMU UNDER ONE-STORY SECTION AND BEHIND THE NEW CONCRETED WALLS CONCURR ENT WITH BACKFILLING THE INTERIOR OF THE EXCAVATION. PROVIDE APPROXIMA TELY 85 CUBIC YARDS TOTAL OF BACKFIL MATERIAL. THE USE OF FLOWABLE FILL CAN BE CONSIDERED
Aug 11, 2025 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE INSTALL CONSTRUCTION FENCE EXPOSURE 3 APPROXIMATELY 20 LINEAR FEET EXPOSURE 4 APPROXIMATELY 40 LINEAR FEET
Aug 9, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ATOI OBSERVED AN UNPERMITTED EXCAVATION WITH NEW FOUNDATION. AT EXP 3. EXISTING FOUNDATION AT EXCAVATION SHOWS SEVERAL CRACKS AND IS BEING SUPPORTED BY 8" CMU. FOOTING AND SUPPORT FOR EXISITNG STRUCTURE IS IN QUESTION.