Brooklyn East Flatbush-Rugby
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04698-0050), so they can include other buildings on the same lot.
62 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Oct 19, 2006 | B | NOV SENT OUT | 3R | SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN DOORFRAME IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ENTRANCE DOOR MORTISE LOCK AT VESTIBULE TO THE BUILDING |
| Oct 19, 2006 | B | NOV SENT OUT | Not available | SECTION 27-2005 ADM CODE PROPERLY SECURE THE LOOSE GRAVITY HOOK AT SECOND AND THIRD STORY BALCONY AT BUILDING FRONT WEST AT FIRE ESCAPE |
| Oct 19, 2006 | A | NOV SENT OUT | Not available | SECTION 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT BUILDING FRONT WEST AT FIRE ESCAPE |
| Oct 19, 2006 | A | NOV SENT OUT | 3R | SECTION 27-2005 ADM CODE REFIT THE WEST WINDOW IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | B | NOV SENT OUT | 3R | SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | B | NOV SENT OUT | 3R | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | A | NOV SENT OUT | 3R | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | A | NOV SENT OUT | 3R | SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | A | NOV SENT OUT | 3R | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Oct 19, 2006 | A | NOV SENT OUT | 3R | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st RADIATOR FROM NORTH AT EAST WALL, 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jan 5, 2005 | B | NOV SENT OUT | BLDG | SECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS. LIGHTS NOT ON. |