Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 27, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROX.25 LINEAR FT OF SWS AT FRONTEXP#1 WITH A 5FOOT OVERHANG /EXTENSION FOR ADDITIONAL PROTECTION OF THE ADJACENT FRONT YARD AT (912 BEGEN ST.).SWS SHALL PROJECT OFF OF THE FRONT (EXP#1) WALL A MIN OF 10 FT |
| Dec 11, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMM. ORDERED IMMEDIATELY STOP WORK ORDER UNDER DEMO PERMIT#32 1762981 DEMOJOB#321762981 MUST BE AMENDED TO SHOW HOW 906 & 908 BERGEN STREET WILL BE STRUCTUALLY SUPPORTED DURING DEMOLITION OF 906, 908 & 910 MUST TAKE PLACE CON CURRENTLY STOP ALL WORK AND MAKE SITE SA FE/STOP ALL WORK&MAKE SITE SAFE AMEND EXISTING DEMO PLAN |
| May 9, 2018 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | DEMOLISH THE ENTIRE BUILDING |
| Jan 3, 2018 | V-DOB VIOLATION - ACTIVE | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jan 3, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.3S+C ATTACH NFP FRAME RESID BLDG DAMAGED IN 3 ALARM FIRE ON 1/2/18.3RDFL+ROOF FRAMING CHARRED.NOGGIN BRICK WALL&EXP 4 HAS PART COLL @3RDFL.ROOF OF SINGLE STORY REAR EXT HAS COLL.BLDG ENVELOPE OPEN& EXPOSED.REMEDY:ENCLOSE FRONT YARD W/LOCKING CHAINLINK FENCE,SEAL BLDG ENVELOPE,RET NYS LIC PE OR RA EVAL BLDG+FILE PLANS.WRK TO BEGIN IMMED |
| Jan 3, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |