Brooklyn Windsor Terrace-South Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 14, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-AT TIME OF INSPECTION PBSERVED: HORIZONTAL CRACKS ON THE CMU LEAD BEARING WALL AT EXP2, NO REBAR IN EXP2 CMU WALL, REAR DOOR FRAMED DEFORMED. IT CAUSED THE SILDE DOOR CANNOT CLOSE TIGHTLY, CORNER OF EXP 3 AND 4 NOT PLUMB. REMEDY: FULLU VACATE THE PROPERTY, PWNER TO BRACE THE CMU WALL AT EXP2. FILE FOR PERMIT WITHIN 48 HRS |
| Jul 14, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDING. AT TIME OF INSP OF THE PREMESIS OBSERVED: HORIZONTAL CRACKS ON THE CMU LOAD BEARING WALL @ EXP 2, NO REBAR IN THE EXP2 CMU WALL, THE REAR DOOR FRAME IS DEFORMED IT CAUSED THE SLIDE DOOR CAN NOT CLOSE TIGHTLY. THE CORNER OF EXP3 AND 4 IS NOT PLUMB. REMEDY: OWNER TO RETAIN NYSPE TO EVAL THE BLDG AND SUMBIT THE REPORT FOR REVIEW |
| Mar 30, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |