Brooklyn Ocean Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 28, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLAINT, DISREPAIR CRACKS HEADERS,BRICKS AND WINDOWS. REMEDY: SUBMIT N1 REPORT, SIDEWALK, SHORING AND REPAIR PLANS FOR REVIEW. RESPOND TO CS ENGINEERING AUDIT BY 09/15/25 |
| Aug 20, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | 1)INSTALL APPROX. 25 LINEAR FT OF SIDEWALK SHED AT EXP-1 FRONT YARD W/ A 5FT CANTILEVER OVERHUNG AT EXPS-1/4 TO PROVIDE OVERHEAD COVERAGE FOR ADJACENT OCCUPANTS & PEDESTRIANS. 2)INSTALL 25 LINEAR FT OF SIDEWALK SHED AT EXPOSURE 3(REAR YARD) WITH A 5FT. CANTILEVER OVERHUNG AT EXPOS URE 3/4 TO PROVIDE OVERHEAD COVERAGE TO ADJACENT OCCUPANTS |