Brooklyn Bedford-Stuyvesant (East)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01621-0030), so they can include other buildings on the same lot.
71 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 16, 2000 | A | VIOLATION DISMISSED | 3F | § 27-2005 ADMIN. CODE: REFIT DOOR IN THE 1st APARTMENT ENTRANCE FROM SOUTH LOCATED AT APT 3F, 3rd STORY |
| Mar 16, 2000 | A | VIOLATION DISMISSED | 3F | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND/OR MAKE OPERABLE TOP/BOTTOM SASHES EAST WINDOW IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY |
| Mar 16, 2000 | A | VIOLATION DISMISSED | 3F | § 27-2005 ADMIN. CODE: REFIT TOP/BOTTOM SASHES WEST WINDOW IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET WATER CLOSET IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOB IN THE FOYER LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ROTTED WOOD AND DOOR FRAME IN THE FOYER LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE AND NATS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WINDOW FRONT ROOM IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2075 ADM CODE DISCONTINUE UNLAWFUL OVERCROWDING 3 STORY REAR APT WITH 164 SQFT LIVING AREA FOR 3 PERSONS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY |
| Mar 1, 2000 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR SADDLE AT ENTRANCE IN THE 1st LIVING ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE COUNTER TOP AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | A | VIOLATION DISMISSED | 1A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WALL ELECTRICAL OUT LET COVER IN THE BATHROOM LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE BATHTUB IN THE BATHROOM LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASHBASIN IN THE BATHROOM LOCATED AT APT 1A, 1st STORY |
| Feb 25, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WINDOW COUNTER BALANCE IN NORTH ROOM IN THE 1st BEDROOM FROM NORTH LOCATED AT APT 1A, 1st STORY |
| Feb 4, 2000 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE METAL FIRE RETARDANTCEILING OVER BOILER FLUE AT 1st OPEN SPACE FROM NORTH, 1st STORY, CELLAR |
| Feb 4, 2000 | B | VIOLATION DISMISSED | 1A | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE METAL FIRE RETARDANT CEILING ABOVE BOILER FLUE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Jan 20, 2000 | B | VIOLATION DISMISSED | 3FL | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES BATHROON AND ; CAUSE OF NO VOLUME OF HOT WATER UNKNOWN IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY |
| Jan 20, 2000 | C | VIOLATION DISMISSED | 3FL | § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY |