Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 6, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING A STRUCTURAL STABILITY REPORT DUE TO DEFECTS OBSERVED AT EXPOSURE 2 AND 4 INTERIOR WALLS AT 1ST STORY WHERE VERTICAL CRACK OBSERVED IN LOAD BEARING WALL |