Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
19 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 12, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER 348220,051325PI30201SB DATED 5/13/25 REQUIRING OWNER TO PROV CORRECTIVE ACTION PLAN BY 6/13/25 & START BLDG REPAIRS UNDER PERMIT BY 7/12/25,COMPLETED/SIGNED OFF BY 8/12/25 AS OF 8/12/25 A CAP&EVEIDENCE OF COMPL WORK WAS NOT REC'D.IMMED COMPLY W/ COMMISSIONER'S ORDER 348220,051325PI30201SB TO PROV A CAP |
| Jun 18, 2025 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| May 28, 2025 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL SIDEWALK SHED ALONG THE FULL WIDTH OF EXPOSURE 1 AND WRAPPING AROUND THE FULL WIDTH OF EXPOSURE 2. ABOUT 126 LINEAR FEET OF SIDEWALK SHED IN TOTAL |
| May 23, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. CONTROL#348221/VIO# 051325PI30202SB DATED 05/13/2025 REQUIRING OWNER TO INSTALL SIDEWALK SHED ALONG FULL LENGTH OF EXP1 ON GREENE AVE WRAPPING AROUND FULL LENGTH OF EXP2 ON VANDERBILT AVE AS OF TODAY 05/23/25 NO SIDEWALJ SHED HAS BEEN INSTALLED.IMMED COMPLY WITH COMM ORDER#051325PI30202SB |
| May 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1/2/4 SEVERLY SPALLING/ CRACKED/LOOSE MASONRY @ MULTIPLE LOCATIONS. THE AWNING @ THE MAIN ENTRANCE OF EXP1 IS DAMAGED/SPALLING & HAS LOOSE MATERIAL HANGING OBSVD DAMAGED CORNICE&CRACKED WINDOW ON GROUND FLOR OF EXP2.OWNER TO IMMED EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN W/IN 30 DAYS |
| May 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER REQ'D. OBSVD SEVERLY SPALLING/CRACKED/LOOSE MSNRY @ MULTIPLE LOCATIONS OF ALL EXPOSURES. OBSVD DAMAGED CORNICE AT EXP2 ONWER TO IMMED RETAIN GC REGISTERED W/DOB TO INSTALL A S/W SHED ALONG FULL LENGTH OF EXP1 @ GREENE AVE WRAPPING AROUND FULL LENGTH OF EXP2 ALONG VANDERBILT AVE. FILE JOB W/DOB W/IN 2 DAYS FROM START OF WORK |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 31, 2009 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 3, 2008 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 8, 2005 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Apr 8, 2005 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Mar 16, 1999 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 13, 1993 | V-DOB VIOLATION - ACTIVE | B-BOILER BOILER OPTIONAL | B-BOILER BOILER OPTIONAL |
| May 2, 1989 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| May 2, 1989 | V*-DOB VIOLATION - DISMISSED | LANDMRK-LANDMARK NONE | LANDMRK-LANDMARK NONE |
| Apr 18, 1989 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Sep 21, 1988 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |