NYC Building Report

Brooklyn Brooklyn Heights

9 College Place, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

28 records

Date Status Type Summary
Oct 30, 2024 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Mar 1, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 1, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 11, 2009 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 11, 2009 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 5, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE APPROVED PLANS @ SITE @ TIME OF INSPECTION, CONTACTOR EXCAVATING @ EXP # 3 OF BLDG 4, EXCAVATION IS FOR THE INSTALLATION OF SHORING @ BLDG # 4, NO PLANS ON SITE FOR SHORING OR SUPPORT OF EXCAVATION REMEDY: SWO BACKFILL IMMEDIATELY, PROVIDE APPROVED PLANS @ CALL SEP/EX
Sep 5, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE APPROVED PLAN @ JOB SITE @ TIME OF INSPECTION, @ BLDG # 4 CONTRACTOR IS PREPARING EXCAVATION FOR SHORING OF EXISTING.3 STORY BRICK BLDG, NO SHORING PLANS ON SITE @ TIME OF INSPECTION REMEDY: SWO BACKFILL IMMEDIATELY PROVIDE APPROVED PLANS
Jun 24, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 1, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 1, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 26, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 26, 2005 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 16, 2004 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 16, 2004 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 12, 2003 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 12, 2003 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 13, 2003 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 13, 2003 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 14, 2002 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Mar 14, 2002 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 21, 2001 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F2514
Feb 21, 2001 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F3738
Dec 10, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F3738
Dec 10, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F2514
Mar 17, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F2514/CEASE USE
Mar 17, 1999 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 3F3738