Brooklyn Canarsie
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 5, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 7, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. HAVING ERECTED A CONCRETE COLUMN AT FRONT OF STAIRWAY AT EAST SIDE OF STAIRWAY TO SUPPORT OVERHEAD ROLL GATE REMEDY: OBTAIN PROPER PERMIT OR REMOVE STRUCTURE |
| May 10, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: CONDTRUCTION OF A MASONRY BLOCK WALL WXTENSION AT EASTERN ELEVATION OF DWELLING TO CREATE ENTRY TO DAY CARE. 2 CIRCUKARCOLS HAS ALSO BEEN ERECTED AT THE NORTH & SOUTH ELEVATION 4 EXTENSION TO CREATE FRAMING FOR ENTRY GATES. REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |