DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 5, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 17, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:BASED ON WKLY MONITOR REPT DATED 9/6/19 AND EXIST CRACK THRU FDN WALL@EXP4 HAS OPEN 1.2MM BTWN 7/16/19 & 9/2/19,A RATE OF APPX 0.2MM WK ON 5/14/19 BLDG SUST DAMAGE.ACTIVE MOVMT HAS RENDERED THE ENTIRE BLDG UNSAFE FOR OCCUPANCY.FULL VACATE OF STRUCT UNTIL SUBSURFACE FOUNDATION REPAIRS HAVE BEEN COMPLETED AS REQ'D BY DOB VIO # 051419FEU30501IK |
| Aug 7, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 2, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER(#051419FEU30501IK) OWNER WAS ORDERED TO PROVIDE PE REPORT BY 6/3/19 AND FILE REPAIR PLANS BY 7/1/19. PE REPORT WAS PROVIDED ON 7/2/19, 31 DAYS AFTER DEADLINE.PE REPORT HAS NO RECOMMENDATIONS FOR REPAIRS AS REQ'D. NO APPLICATION FOR REPAIRS HAVE BEEN FILED.COMPLY WITH COMMISH ORDER (#051419FEU30501IK) |
| Jun 11, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.(#05141930503IK) OWNER WAS ORDERED TO IMMEDIATELY BEGIN AN OPTICAL MONITORING CAMPAIGN TO DETERMINE WHETHER THE BLDG WAS MOVING ACTIVELY.OWNER WAS SERVED ON SITE ON MAY 15,2019 AND OWNER WAS PROVIDED A COURTESY COPY VIA EMAIL ON MAY 15,2019.COMPLY WITH COMMISSIONER ORDER #05141930503IK |
| May 14, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK:SEE DOB VIO # 051419FEU30501K FOR DESCRIPTION OF FAILURE TO MAINTAIN CONDITION.OWNER TO HIRE LICENSED NYSPE TO DSGN TEMP STABL FOR SETTLING FOUNDATIONS.HIRE DOB REGISTERED CONTRCT TO IMMED INSTALL TEMP STABL.WRK TO BEGIN IMMED&CONTIN SUPV BY ONSITE PE.SEND DAILY REPTS TO FEU.FILE APP FOR TEMP STABL WITHIN 2 BUSSINESS DAYS OF START OF WORK |
| May 14, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:FDN@EXP 1/4 CORNER HAS SETTLED CONC FDN WALLS CRACKED/SLOPED DOWN TOWARDS SETTLED CORNER W/SUPPT BRICK VENEER CONC FDN WALLS LACK PROPER STEEL REINFORCING SETTLEMENT OF FOUND WALLS DISPLACED EXP1&4 BEAR WALL PULLED&DMG EXP 2 PARTY WALL OWN RET PE EVAL BLDG&DEVELOP REPR PLANS PR OVIDE ENG REP 6/3/19 FILE PLANS 7/1/19 BEG WRK 9/1/19 COMP WRK 1/1/20 |
| May 14, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | SEE DOB VIOLATION # 051419FEU30501IK FOR CONDITIONS.OWNER TO IMMEDIATE LY BEGIN AN OPTICAL MONITORING CAMPAIGN TO DETERMINE WHETHER OR NOT BLDG IS ACTIVELY MOVING.CAMPAIGN TO BE DESIGNED BY NYS-LIC PROF ENG&PE RFORMED BY AN NYS LIC DEVELOPER.READINGS SHALL BE TAKEN 2X/WEEK FOR A MINIMUM OF 4 WKS.RPRT TO FEU MOVEMENT OF 1/8" OR GREATER BTWN READINGS |