Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
25 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED CRACKED AND DAMAGED WINDOW SILL AT MULTIPLE LOCATIONS AT EXP 1 NORTH ELEVATIONS. REMEDY: REPAIR AND/OR REPLACE |
| Nov 27, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSP ECTION OBSERVED BUILDING WITH MULTIPLE STRESS CRACKS ON ALL FACADE WAL LS COMPROMISING BUILDING INTEGRITY. REMEDY: SUBMIT ENGINEERS REPORT EV ALUATING STRUCTURAL STABILITY OF CITED CONDITIONS TO ERTINSPECTIONS@BU ILDINGS.NYC.GOV 718-286-3460 |
| Nov 20, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION OBSERVED CRACKED AND DAMAGED WINDOW SILLS AT EXPOSURE ONE. REMEDY: REPAIR AND/OR REPLACE |
| Aug 7, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 11, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WRK.EXP2(EAST)BRCK WALL HAS AN OUTWRD LEANINGPARAPET AT TOP, FROM EXP1/2CRNR TO APPRX 2FT FRM EXP2/3(SOUTHEAST)CRNRCONTINUOUS CRCK@ MIDDLE WNDOWS FRM CELLAR TO ROOF@EXP2 WALL.CRCKS.COMPLY WITH DOB VIOLATION #101123FEU30801BS IMMEDIATELY |
| Oct 11, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.EXP2(EAST)BRCK WALL HAS AN OUTWRD LEANINGPARAPET @TOP, FROM EXP1/2CRNR TO APPRX 2FT FRM EXP2/3(SOUTHEAST)CRNRCONTINUOUS CRCK@ MIDDLE WNDOWS FRM CELLAR TO ROOF@EXP2 WALL.CRCKS.1.IMMED INSTALL SDWALK SHED IN REAR YRD@EXP2 W/OVERHAUL INTO NEIGHBR'S REAR YRD, 2.IMMED RMVE LEANING PARAPET&REPLACE IN |
| Oct 11, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.FIRE ESCAPE@EXP2 IN STATE OF DISREPAIR.MISSNG BOLT&BROKNBOLT@EXP2 (EAST)FIRE ESCAPE GOOSENECK.UNBOLTD CONNECTION@RAILNG BRACE @TOP LEVEL OF EXP2(EAST)FIRE ESCAPE GOOSENECK.UNBOLTD CONNECTION@RAILNG.1.NYS PE QEWI TO IMMED EVAL ALL FIRE ESCAPES&&DESIGN RPAIRS,2.IF PRMT REQ'D FOR RPAIRS PER CODE,FILE BY 11/24/23 |
| Oct 11, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 9, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #011923FEU30802BS(CONTROL#341112)REQUIRED TO EXT WALLS UNDR PERMIT W/ FILING BY 3/20/23&WORK TO START UNDR PERMIT BY 4/3/23.THIS VIOLATION WAS ISSUED ON 1/19/23.NO COMPLETED FILING OR PERMIT EXISTS FOR REPAIRS AS OF 5/9/23 |
| May 9, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO:CRCKC OBSRVD IN STONE&BRCK MASONRY @EXP1(NORTH),EXP2 (EAST),&EXP4(WEST)EXTERIOR WALLS.PREV POINTED CRCKS@EXP4 HAVE.REOPENED IN MULT LOCTNS.CRCKS OBSRVD @ INTERIOR FINISHES ON UPPR.COMPLY WITH DOB VIOLATION #011923FEU30801BS IMMEDIATELY |
| Jan 19, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.MULT CRCKS OSBVD IN STONE&BRCK MASONRY @EXP1(NORTH),EXP2(EAST),& EXP4(WEST)EXT WALLS.PREV POINTED CRCKS@EXP4 HAVE REOPENED IN MULT LOCTNS.CRCKS OSBVD@INT FINISHES ON UPPER LVLS.NO ACCESS TO CELLAR 1.NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DESIGN REPAIRS,2.FILE FOR RPAIRS BY 3/20/23,3.OBTN PRMT&STRT WRK BY 4/3/23 |
| Apr 27, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 8, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 40 FEET OF SIDE WALK SHED AT EXPOSURE # 1 TO SAFE GUARD THE PUBLIC AND PROPERTY |
| Jan 31, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL AN APPROXIMATE TOTAL OF 135 LINEAR FEET OF SIDEWALK SHED |
| Jan 30, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT THE TIME OF INSPECTION IT WAS OBSERVED THAT THE BUILDING EXTERIOR WAS BULGING AT EXPOSURE #4 AND THERE WAS CRACKS THROUGHOUT THE EXTERIOR ALONG WITH CRACKS THROUGHOUT THE INTERIOR. THERE WAS ACCESS TO AN APARTMENT ON THE FIRST FLOOR WHERE THE FLOORS WERE SLOPED AND SAGGING AND DOOR COULD NOT OPEN AND CLOSE DUE TO SHIFTING. |
| Apr 25, 2012 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Oct 2, 2007 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 7, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ECB HAZARDOUS |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Dec 3, 1997 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |