Brooklyn Crown Heights (North)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-01149-0015), so they can include other buildings on the same lot.
310 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Aug 27, 2015 | A | VIOLATION CLOSED | 3B | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ESCUTCHEON RING AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 27, 2015 | A | VIOLATION CLOSED | 3B | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3B | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Aug 27, 2015 | A | VIOLATION DISMISSED | 3L | § 27-2005 ADM CODE REFIT WINDOW SASHES AT EAST WINDOW IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION DISMISSED | 3L | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW STOOL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION DISMISSED | 3L | § 27-2005 ADM CODE REFIT DOOR AT ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON RING AT HEAT RISER IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON RING AT HEAT RISER IN THE 3rd ROOM FROM EAST LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE TO WATER CLOSET IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION DISMISSED | 3L | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON RING AT HEAT RISER IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WEST CERAMIC TILE WALL IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE VENT IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION DISMISSED | 3L | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW STOOL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 1A | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 1A | § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WASH BASIN CABINET IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION CLOSED | 1A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW STOOLS IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | A | VIOLATION CLOSED | 1A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | 1A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE EAST FIRE RETARDANT WALL IN 1ST STORY PUBLIC HALL |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK INSTALLED AT ENTRANCE DOOR TO BLDG |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT 1ST STORY PUBLIC HALL VESTIBULE |
| Aug 27, 2015 | B | VIOLATION CLOSED | 3L | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. MAKE STATIONARY THE IRON LADDER LEADING TO SCUTTLE OPENING IN ROOF 4TH STORY PUBLIC HALL |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING IN 4TH STORY PUBLIC HALL |
| Aug 27, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT 3RD STORY PUBLIC HALL |
| Aug 27, 2015 | A | VIOLATION DISMISSED | Not available | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT AT REAR FIRE ESCAPE ALL STORIES |
| Jun 23, 2015 | B | VIOLATION CLOSED | 1A | § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 23, 2015 | B | VIOLATION CLOSED | 1A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 23, 2015 | B | VIOLATION CLOSED | 1A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 23, 2015 | B | VIOLATION CLOSED | 1A | § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE PIPE UNDER SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jun 23, 2015 | B | VIOLATION CLOSED | 1A | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 23, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS ENTRANCE TO BUILDING , 1st STORY |
| Mar 23, 2015 | B | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAILBOXES AT WEST WALL VESTIBULE AT PUBLIC HALL, 1st STORY |
| Oct 18, 2014 | B | VIOLATION DISMISSED | Not available | § 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING A MINIMUM OF 100 WATTS OF INCANDESCENT LIGHT REQUIRED. (LIGHT FIXTURE PRESENT) |
| Sep 9, 2014 | B | VIOLATION DISMISSED | 3B | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | B | VIOLATION DISMISSED | 3B | § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | C | VIOLATION CLOSED | 3B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILNG AND THE EAST AND NORTH WALLS APPROX. 7SQ.FT. IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | B | VIOLATION DISMISSED | 3B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT THE DOOR TO THE PUBLIC HALL (USED AS 2ND MEANS OF EGRESS) IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | A | VIOLATION CLOSED | 3B | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Sep 9, 2014 | B | VIOLATION DISMISSED | 3B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, APARTMENT AT WEST |
| Dec 11, 2013 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK ON DOOR AT STREET ENTRANCE TO BUILDING |
| Jul 19, 2012 | C | VIOLATION CLOSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING MECHANISM AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY |
| Mar 21, 2011 | A | VIOLATION CLOSED | 3B | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM NORTH, THE KITCHEN , THE 2nd ROOM FROM NORTH, THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 21, 2011 | B | VIOLATION CLOSED | 3B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT CEILING IN BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 21, 2011 | B | VIOLATION CLOSED | 3B | § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROXIMATELY 20 SQ. FT AT CEILING, WEST AND NORTH WALL IN BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |