Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO TEMPORARY SHORING AT CELLAR LEVEL. ONE OF THE TEMPORARY SHORING IS NOT AT PLUMB LEVEL AND LEANING AT A 45-DEGREE ANGLE. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. |
| Jun 26, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT REAR OF CELLAR, WOOD GIRDER OUT OF POCKET AND FLOOR JOIST SAGGING. OBSERVED SCREW JACKS INSTALLED WITHOUT ENGINEERS GUIDANCE AND JACKS NOT PLUMB. |
| Dec 23, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |