Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 14, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG SAFE COND:OBS.DETERIOR MORTAR JOINTS @EXP1 NEAR 2FLR EXP1/2 CRNR;EXP 2 APPEAR SLIGHTLY BULG OUT AT BSMNT WALL WITH VERT CRACKS IN STUCCO/PARGING;EXP3 HAD VERT CRACKS ALONG WINDOWS NEAR EXP 2/3 CORNER OWNER RETAIN NYSPE TO EVALU ENTIRE BLDG AND PREPARE REPAIR DRWGS.BLDG REPAIRED UNDER PERMIT STARTING BY 7/6/20 AND COMPLETED BY 9/4/20 |
| Apr 11, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO PARTIAL COLLAPSE AT ADJOINING PROPERTY 92 MADISON STREET |
| Apr 11, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO PARTIAL COLLAPSE AT ADJOINING PROPERTY 92 MADISON STREET VACATE WARRENTED FOR SAFETY OF OCCUPANTS |
| Dec 20, 2006 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |