Brooklyn Crown Heights (South)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 29, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROX 24 LINEAR FT OF SIDEWALK SHED ALONG THE MARQUEE AT EXP 1 & EXTEND APPROX 5 FT ON BOTH SIDES. A SECTION OF THE SHED SHALL BE INSTALLED BELOW THE MARQUEE TO CAPTURE ANY LOOSE/HANGING PIECES. THE SIDEWALK SHED SHALL ALSO BE INSTALLED TIGHT BACK TO THE BUILDING & EXTEND ACROSS THE SIDEWALK |
| Aug 29, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED : AT TIME OF INSPECTION ,OBSERVED AT EXPOSURE 1 UNDER THE MARQUEE THERE IS MISSING METAL PANELS , ALSO ON THE LEFT SIDE OF THE MARQUEE THE SIGN IS BROKEN IN SEVERAL AREAS , THIS CAN BE A DANGER TO PEDESTRIANS WALKING ON THE SIDE WALK UNDER THE MARQUEE. |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 10, 1997 | VP-VIOLATION UNSERVED ECB-ACTIVE | B-BOILER BOILER OPTIONAL | B-BOILER BOILER OPTIONAL |