NYC Building Report

Brooklyn Gravesend (West)

8313 Bay Parkway, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-06331-0001), so they can include other buildings on the same lot.

61 records

Date Class Status Apartment Summary
Feb 22, 2020 C VIOLATION CLOSED 6F § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH
Dec 12, 2019 C VIOLATION CLOSED 2J § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
Nov 16, 2019 A VIOLATION DISMISSED Not available § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING PLASTIC SAFETY CAPS OR COVERS AT ELECTRIC OUTLETS AT EAST-NORTH AND SOUTH WALLS AT PUBLIC HALL, 1st STORY
Jun 19, 2017 A VIOLATION CLOSED Not available § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
Jun 19, 2017 A VIOLATION CLOSED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Jun 19, 2017 A VIOLATION CLOSED Not available § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILNG AT THE BULKHEAD PUBLIC HALL
Jun 19, 2017 A VIOLATION CLOSED Not available § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT THE BULKHEAD PUBLIC HALL
Jun 19, 2017 B VIOLATION CLOSED Not available § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK NEAR THE SKYLIGHT AT THE BULKHEAD PUBLIC HALL
Jun 19, 2017 A VIOLATION CLOSED 5E § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
Jun 19, 2017 A VIOLATION CLOSED 5E § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM WEST AT NORTH
Jun 19, 2017 A VIOLATION CLOSED 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH