Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 14, 2010 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBTAIN PLANS AND PERMITS,PROVIDE ENGINEER'S REPORT TO THE DOB ENSURING STABILITY OF THE STRUCTURE |
| Jan 24, 2000 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: TWO STEEL BEAMS INSTALLED UNDER FIRST STORY FLOOR NORTH AND SOUTH SIDE REMEDY: OBTAIN A PERMIT FORTHWITH AND SUBMIT ENGINEER'S REPOST AS TO STRUCTURE STABILITY |
| Dec 20, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: COMBUSTIBLE PIGEON COOP ERECTED AT N/E SECTION OF ROOF APPROX 20FT LONG, 8FT WIDE AND 20FT HIGH REMEDY: REMOVE ILLEGAL STRUCTURE FORTHWITH |
| Sep 28, 1999 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: PIGEON COOP STRUCTURE CONSTRUCTED A AT ROOF APPROX. 20 FT LONG, 8 FT WIDE. AND 8 FT HIGH REMEDY: OBTAIN A PERMIT FORTHWITH OR REMOVE ILLEGAL STRUCTURE AND RES- TORE THE PREMISES TO PRIOR LEGAL CONDITION |
| Sep 28, 1999 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 9, 1998 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Jun 1, 1998 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | HAZARDOUS |