Brooklyn East Flatbush-Rugby
818 Linden Boulevard, Brooklyn
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04678-0010), so they can include other buildings on the same lot.
7 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jun 26, 2013 | B | VIOLATION CLOSED | 2NDFL | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY |
| Jun 26, 2013 | B | VIOLATION CLOSED | 2NDFL | SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK THROUGHTOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY |
| Jun 23, 2013 | B | VIOLATION CLOSED | 2 | SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY |
| Jun 23, 2013 | C | VIOLATION CLOSED | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY |
| Jun 23, 2013 | C | VIOLATION CLOSED | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY |
| Jun 23, 2013 | B | VIOLATION CLOSED | 2 | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY |
| Jun 23, 2013 | A | VIOLATION DISMISSED | Not available | SECTION 27-2027 ADMIN. CODE: PROVIDE PROPERLY TRAPPED, SEWER CONNECTED, RAIN LEADER SO AS TO PROVIDE PROPER DRAINAGE AND FILE AN APPLICATION FOR APPROVAL BEFORE DOING THE WORK AT EAST AND WEST OF ROOF |