NYC Building Report

Brooklyn East Flatbush-Rugby

814 Albany Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Apr 16, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL APPROXIMATELY 35 LINEAR FT OF SIDEWALK SHED AT FRONT EXPOSURE 1, WHICH INCLUDES COVERAGE PROTECTION FOR ENTRANCE DOORS OF 814 ALBANY AVENUE AND 820 AVENUE. SIDEWALK SHED SHALL ALSO WRAP AROUND EXPOSURE 4 SIDE AN ADDITIONAL 8 FT
Apr 16, 2026 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL APPROXIMATELY 35 LINEAR FT OF SIDEWALK SHED AT FRONT EXPOSURE 1, WHICH INCLUDES COVERAGE PROTECTION FOR ENTRANCE DOORS OF 814 ALBANY AVE AND 820 ALBANY AVE. SIDEWALK SHED SHALL ALSO WRAP AROUND EXPOSURE 4 SIDE AN ADDITIONAL 8 FEET
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jan 29, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL OVERHEAD PROTECTION AT BOTH FRONT AND RIGHT SIDE EXPOSURE - APPROX 30 LINEAR FEET AT FRONT AND 80 LINEAR FEET AT THE RIHT SIDE, TO SAFE GUARD THE PUBLIC AND PROPERTY
Jan 27, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER HAVING THE FRONT AND RIGHT SIDE FACADE IN A STATE OF DISREPAIR - REQUESTING AN ENGINEER'S REPORT AND IED FOR OVERHEAD PROTECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Oct 11, 1989 VP-VIOLATION UNSERVED ECB-ACTIVE B-BOILER BOILER OPTIONAL 24A/24B