Brooklyn Bushwick (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 9, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT A TOTAL OF APPROXIMATELY 14 LINEAR FEET OF SIDEWALK SHED AS FOLLOWS: -EXPOSURE 1, FLUSHING AVE, APPROXIMATELY 6 LINEAR FEET -EXPOSURE 4, APPROXIMATELY 8 LINEAR FEET TO PROTECT THE FRONT YARD OF THE ADJACENT PROPERTY AT 802 FLUSHING AVENUE |
| Feb 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED FACADE IN STATE OF DISREPAIR AT EXP#4 STUCCO DISPLACED ,BULGING AND IN DANGER TO FUTURE COLLAPSE, ALSO AT EXP#1 FACADE HAS CRACKS AT MULTIPLE LOCATIONS. |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Mar 9, 2015 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |