8 Sidney Place, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Mar 28, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM.THE NORTH WALL IS IN STATE OF DISREPAIR.AT THE 1ST FL THOOTER BRICK LAYER IS DETACHING&BOWING OUTWARD.WALL IS STRCTRLLY COMPROMISED OWNER TO ENGAGE MYS LICENSED PE CNTRCTR TO EVALUATE BLDG&RPAIR UNDR PRMT.FILE FOR PRMT BY 4/17/23.CMPLTE&SGN OF RPRS
Mar 28, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMER WORK.THE NORTH WALL IS STRCTRLLY CMPRMSED.@THE 1STFL WALL IS BOWING OUTWARD.THE BRCK LAYERS HAVE SEPARATED.THERE IS POTENTIAL OF PARTIAL COLLAPSE.IMMEDIATELY INSTALL TEMPORARY SHORING ADJACENT TO NORTH WALL TO SUPPORT FLOOR FRAMING.2.BRACE EXTERIOR WALL. ALL WRK TO BE
Apr 17, 2006 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Feb 10, 1997 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
May 3, 1994 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
May 3, 1994 V*-DOB VIOLATION - DISMISSED LANDMRK-LANDMARK NONE LANDMRK-LANDMARK NONE
May 3, 1994 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 1, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED